| Taylor Morrison of Georgia |
256 |
6 |
December 2025 – October 2026 |
$134M |
| Fortune-Johnson |
20 |
2 |
April 2026 – August 2026 |
$109M |
| Oxford Properties |
31 |
2 |
January 2026 – September 2026 |
$106M |
| Stanley Martin Homes |
208 |
3 |
December 2025 – November 2026 |
$98M |
| Meritage Homes of Georgia |
161 |
3 |
January 2026 – November 2026 |
$82M |
| DRB Group Georgia |
118 |
4 |
February 2026 – November 2026 |
$73M |
| Thompson Thrift |
15 |
2 |
March 2026 – May 2026 |
$70M |
| MSP Construction |
19 |
1 |
June 2026 – September 2026 |
$69M |
| Hanover RS Construction |
27 |
1 |
June 2026 |
$60M |
| Lennar Georgia |
143 |
3 |
December 2025 – September 2026 |
$59M |
| Westplan Investors |
15 |
1 |
August 2026 – September 2026 |
$59M |
| Brasfield & Gorrie |
41 |
1 |
April 2026 – August 2026 |
$56M |
| Clayton Properties Group |
147 |
2 |
January 2026 – October 2026 |
$55M |
| D.R. Horton |
95 |
3 |
January 2026 – July 2026 |
$54M |
| Toll Brothers |
41 |
1 |
February 2026 – October 2026 |
$40M |
| GS Construction GA/TN |
11 |
1 |
March 2026 – April 2026 |
$39M |
| Richardson Housing Group |
79 |
2 |
January 2026 – October 2026 |
$33M |
| Lincoln Contracting & Equipment |
26 |
1 |
February 2026 – November 2026 |
$33M |
| Pulte Home |
41 |
1 |
December 2025 – November 2026 |
$30M |
| Beazer Homes |
53 |
2 |
December 2025 – October 2026 |
$29M |
| The Conlan |
7 |
1 |
February 2026 – August 2026 |
$27M |
| Dematic |
2 |
1 |
February 2026 – September 2026 |
$27M |
| The Gordon Highlander |
3 |
1 |
February 2026 – September 2026 |
$26M |
| Davidson Homes |
42 |
3 |
February 2026 – November 2026 |
$25M |
| Fabri Constructors |
28 |
4 |
February 2026 – September 2026 |
$24M |
| Amh Development Georgia |
48 |
2 |
December 2025 – November 2026 |
$22M |
| Lakeshore Engineering |
1 |
1 |
July 2026 |
$20M |
| KM Homes |
25 |
1 |
January 2026 – September 2026 |
$19M |
| House Martins |
27 |
1 |
June 2026 – October 2026 |
$17M |
| ZPC Contractors |
7 |
1 |
April 2026 – August 2026 |
$16M |
| CCG Constructors |
40 |
1 |
January 2026 – September 2026 |
$16M |
| Garrard Construction |
24 |
2 |
January 2026 – October 2026 |
$14M |
| Walker Anderson Homes |
34 |
1 |
January 2026 – October 2026 |
$14M |
| Rockhaven Homes |
29 |
2 |
February 2026 – November 2026 |
$13M |
| Ashton Atlanta Residential |
21 |
1 |
January 2026 – August 2026 |
$12M |
| McKinley Construction |
24 |
1 |
January 2026 – October 2026 |
$12M |
| Eastwood Homes of Georgia |
21 |
2 |
December 2025 – October 2026 |
$11M |
| Parkland Homebuilders |
13 |
2 |
January 2026 – October 2026 |
$11M |
| O'Dwyer Properties |
19 |
1 |
January 2026 – October 2026 |
$9.9M |
| Williams Icon Homes & Properties |
2 |
1 |
July 2026 – August 2026 |
$9.5M |
| Hospitality Constructors |
7 |
1 |
August 2026 |
$8.8M |
| Blackwater Construction |
1 |
1 |
March 2026 |
$8.4M |
| Star Construction & Development |
11 |
5 |
March 2026 – September 2026 |
$8.3M |
| Carroll Daniel |
1 |
1 |
April 2026 |
$8.0M |
| Hitt Contracting |
2 |
1 |
March 2026 – September 2026 |
$7.9M |
| Highland Custom Homes |
12 |
2 |
March 2026 – September 2026 |
$7.5M |
| SDH Atlanta |
19 |
1 |
February 2026 – July 2026 |
$7.0M |
| Direct Residential |
12 |
2 |
March 2026 – October 2026 |
$6.9M |
| Pleasantly Build Homes |
17 |
7 |
January 2026 – October 2026 |
$6.8M |
| John F. Pennebaker |
1 |
1 |
April 2026 |
$6.7M |
| Novak Construction |
2 |
1 |
April 2026 |
$6.4M |
| Moha Construction |
14 |
4 |
January 2026 – November 2026 |
$6.1M |
| Lha Homes |
12 |
1 |
February 2026 – November 2026 |
$6.0M |
| Trident Building Solutions |
11 |
1 |
February 2026 – October 2026 |
$5.8M |
| Gwinnett Schools |
23 |
7 |
January 2026 – May 2026 |
$5.7M |
| Scott Puckett |
9 |
1 |
January 2026 – August 2026 |
$5.7M |
| Casteel Heating & Cooling |
453 |
14 |
December 2025 – November 2026 |
$5.1M |
| LDG General Contracting |
12 |
2 |
April 2026 – October 2026 |
$5.0M |
| 3 Builders GA |
9 |
5 |
April 2026 – September 2026 |
$4.9M |
| Atai Constructions |
16 |
4 |
March 2026 – November 2026 |
$4.9M |
| Northpointe Communities |
10 |
1 |
January 2026 – June 2026 |
$4.8M |
| Diversified Construction of Georgia |
1 |
1 |
March 2026 |
$4.8M |
| Resibuilt Homes |
12 |
1 |
June 2026 |
$4.8M |
| Chin Ho Yi |
19 |
6 |
December 2025 – October 2026 |
$4.7M |
| European Construction & Design |
6 |
3 |
February 2026 – October 2026 |
$4.7M |
| Thurgood Construction |
12 |
1 |
March 2026 – May 2026 |
$4.5M |
| Liberty Communities |
12 |
1 |
December 2025 – February 2026 |
$4.4M |
| Isaac Construction |
3 |
2 |
February 2026 – August 2026 |
$4.3M |
| Sterling Manor |
10 |
1 |
November 2026 |
$4.3M |
| Wh Bass |
12 |
3 |
May 2026 – August 2026 |
$4.2M |
| Courtyard Construction |
8 |
1 |
May 2026 – October 2026 |
$4.1M |
| C&W Contracting Services |
9 |
3 |
May 2026 – October 2026 |
$4.1M |
| El Mina |
12 |
5 |
January 2026 – August 2026 |
$4.1M |
| Forgay Passarella |
4 |
2 |
March 2026 – June 2026 |
$4.0M |
| Multiplex |
1 |
1 |
April 2026 |
$4.0M |
| Southern Heritage Home |
7 |
1 |
May 2026 – August 2026 |
$4.0M |
| J. Patrick O'Donnell |
8 |
1 |
March 2026 – September 2026 |
$3.9M |
| Atlantic Flair Homes |
5 |
2 |
March 2026 – November 2026 |
$3.8M |
| Merit Construction |
16 |
4 |
March 2026 – November 2026 |
$3.8M |
| TE Certified Electrical, Heating & Cooling |
519 |
15 |
December 2025 – November 2026 |
$3.7M |
| Knoll Construction |
1 |
1 |
July 2026 |
$3.6M |
| Gw Construction |
13 |
2 |
January 2026 – September 2026 |
$3.6M |
| Cornerstone Building |
4 |
1 |
October 2026 |
$3.6M |
| Richport Properties |
11 |
1 |
May 2026 – August 2026 |
$3.4M |
| Dominy Construction Group |
1 |
1 |
September 2026 |
$3.4M |
| Cortland Improvements |
2 |
1 |
May 2026 – August 2026 |
$3.2M |
| Cresthaven |
2 |
1 |
April 2026 – May 2026 |
$3.2M |
| Centro Development |
6 |
1 |
January 2026 – September 2026 |
$3.1M |
| Tipton Home Builders |
3 |
1 |
September 2026 |
$3.0M |
| Vilas Design |
4 |
1 |
January 2026 – October 2026 |
$2.9M |
| Place Services |
3 |
2 |
February 2026 – October 2026 |
$2.9M |
| White Rock |
3 |
2 |
July 2026 |
$2.8M |
| Kinzey Construction |
8 |
4 |
August 2026 – November 2026 |
$2.8M |
| Knaeble Homes |
8 |
5 |
April 2026 – August 2026 |
$2.7M |
| Jim Cooper Construction |
1 |
1 |
March 2026 |
$2.7M |
| Universal Heating & Cooling |
280 |
14 |
December 2025 – November 2026 |
$2.7M |
| Capital City Mechanical |
2 |
2 |
April 2026 – August 2026 |
$2.6M |
| Acsm |
2 |
1 |
October 2026 |
$2.5M |
| Storey Custom Homes |
3 |
1 |
June 2026 – September 2026 |
$2.5M |
| Real and Virtual Properties |
6 |
2 |
January 2026 – September 2026 |
$2.5M |
| Traton |
8 |
1 |
February 2026 – June 2026 |
$2.4M |
| Sterlingwood Homes |
6 |
1 |
January 2026 – June 2026 |
$2.4M |
| Fibre Construction |
3 |
1 |
March 2026 – June 2026 |
$2.4M |
| Grigor Construction |
2 |
1 |
August 2026 |
$2.4M |
| Signature Homes By |
4 |
1 |
February 2026 – March 2026 |
$2.4M |
| Excel Capital Construction |
2 |
1 |
February 2026 – June 2026 |
$2.3M |
| Atkinson Interior |
4 |
2 |
February 2026 – August 2026 |
$2.3M |
| Maisha Builders |
10 |
3 |
January 2026 – April 2026 |
$2.3M |
| Mutual Home Solutions |
5 |
2 |
March 2026 – October 2026 |
$2.3M |
| Steez |
4 |
1 |
December 2025 – August 2026 |
$2.2M |
| Correct Builders |
3 |
2 |
August 2026 – September 2026 |
$2.1M |
| Richard William Blount |
3 |
3 |
February 2026 – April 2026 |
$2.1M |
| DMR&B Construction |
4 |
3 |
January 2026 – June 2026 |
$2.1M |
| Rycon Construction |
2 |
1 |
July 2026 – October 2026 |
$2.0M |
| Daleco Construction Group |
1 |
1 |
April 2026 |
$2.0M |
| Amazing Home |
3 |
2 |
April 2026 – June 2026 |
$2.0M |
| Group M & D |
11 |
5 |
January 2026 – November 2026 |
$1.9M |
| Artlantic |
3 |
3 |
May 2026 – June 2026 |
$1.9M |
| Gali Properties |
2 |
1 |
September 2026 |
$1.9M |
| Whitaker Development |
2 |
1 |
January 2026 |
$1.9M |
| Infinite Estate |
3 |
2 |
June 2026 – September 2026 |
$1.9M |
| Gwinnett County Habitat |
6 |
1 |
January 2026 – June 2026 |
$1.9M |
| New Beginning Property |
2 |
1 |
October 2026 – November 2026 |
$1.9M |
| R.A. Heath Construction |
4 |
2 |
May 2026 – October 2026 |
$1.8M |
| Rainwater Construction |
2 |
1 |
May 2026 – July 2026 |
$1.8M |
| Npsg Built |
1 |
1 |
October 2026 |
$1.8M |
| Barnsley Consulting |
1 |
1 |
March 2026 |
$1.8M |
| Reyes Development |
3 |
2 |
August 2026 – September 2026 |
$1.8M |
| Colonnade Enterprises |
2 |
1 |
October 2026 |
$1.8M |
| Marcelectric |
3 |
3 |
December 2025 – July 2026 |
$1.8M |
| Genoa Construction |
4 |
1 |
April 2026 – May 2026 |
$1.8M |
| Reliable Heating & Air |
252 |
13 |
December 2025 – November 2026 |
$1.7M |
| Deem |
1 |
1 |
June 2026 |
$1.7M |
| North Highlands |
2 |
1 |
October 2026 |
$1.7M |
| Triseptem Developers |
2 |
2 |
July 2026 – October 2026 |
$1.6M |
| A1 Construction Group |
1 |
1 |
June 2026 |
$1.6M |
| Tripoint Build |
1 |
1 |
September 2026 |
$1.6M |
| Northstar Contracting |
1 |
1 |
May 2026 |
$1.6M |
| Heaton Design Build |
2 |
1 |
August 2026 – November 2026 |
$1.6M |
| Cool Air Mechanical |
120 |
13 |
December 2025 – November 2026 |
$1.6M |
| Tri-South Enterprises |
3 |
1 |
June 2026 |
$1.5M |
| Bowen & Bowen |
2 |
1 |
August 2026 |
$1.5M |
| Climate Heros |
103 |
11 |
February 2026 – November 2026 |
$1.5M |
| Coolray Mr Plumber |
121 |
12 |
December 2025 – November 2026 |
$1.5M |
| Steele & Associates |
1 |
1 |
June 2026 |
$1.5M |
| Warren-Hanks Const |
1 |
1 |
November 2026 |
$1.4M |
| Hl Contractors |
4 |
2 |
March 2026 – August 2026 |
$1.4M |
| Field Family Properties |
2 |
1 |
July 2026 |
$1.4M |
| M.N.B. Homes |
3 |
1 |
February 2026 – November 2026 |
$1.4M |
| Premier Construction |
1 |
1 |
March 2026 |
$1.4M |
| Red Point Construction |
6 |
1 |
August 2026 |
$1.3M |
| U.S. General Construction |
4 |
3 |
August 2026 – October 2026 |
$1.3M |
| CGS |
2 |
2 |
October 2026 |
$1.3M |
| Palatine Construction |
4 |
2 |
January 2026 – September 2026 |
$1.2M |
| South East Estates |
2 |
2 |
January 2026 – February 2026 |
$1.2M |
| Christian Brothers |
3 |
1 |
June 2026 – July 2026 |
$1.2M |
| Sta -Dry Roofing |
4 |
2 |
July 2026 – September 2026 |
$1.2M |
| Soapstone Construction |
11 |
6 |
February 2026 – July 2026 |
$1.2M |
| Centimark |
3 |
2 |
March 2026 – August 2026 |
$1.1M |
| Alkon Group |
2 |
1 |
September 2026 |
$1.1M |
| Ultra Commercial Veteran |
4 |
2 |
January 2026 – April 2026 |
$1.1M |
| Alston Construction |
2 |
1 |
April 2026 – July 2026 |
$1.1M |
| American Investment |
1 |
1 |
February 2026 |
$1.1M |
| Archipro Construction |
2 |
1 |
September 2026 – November 2026 |
$1.1M |
| Sandals Luxury Pools |
9 |
7 |
February 2026 – November 2026 |
$1.1M |
| Keystone South |
4 |
2 |
March 2026 – September 2026 |
$1.0M |
| Hobgood Construction |
3 |
1 |
February 2026 – March 2026 |
$1.0M |
| Rwalls |
11 |
1 |
September 2026 |
$1.0M |
| Clayton Joseph |
1 |
1 |
April 2026 |
$1.0M |
| 3D Security |
1 |
1 |
July 2026 |
$1.0M |
| CL Burks Construction - Commercial Roofing |
1 |
1 |
April 2026 |
$1.0M |
| HJB Construction |
1 |
1 |
October 2026 |
$1.0M |
| Timber Ridge Contractors |
29 |
5 |
February 2026 – September 2026 |
$991K |
| Ezekiel Construction |
3 |
2 |
December 2025 – October 2026 |
$990K |
| AB3 Services |
2 |
1 |
March 2026 – June 2026 |
$981K |
| G Custom Homes |
2 |
2 |
July 2026 – August 2026 |
$981K |
| Fasanelli Construction |
2 |
1 |
August 2026 – September 2026 |
$964K |
| Michael Joseph |
1 |
1 |
March 2026 |
$938K |
| MSM International |
1 |
1 |
October 2026 |
$898K |
| Wall Technologies |
9 |
3 |
January 2026 – September 2026 |
$893K |
| Moses Construction |
1 |
1 |
May 2026 |
$885K |
| Pinnacle International |
1 |
1 |
February 2026 |
$885K |
| Boyce Design Build |
2 |
1 |
April 2026 – June 2026 |
$880K |
| Shady Vent Construction |
4 |
3 |
January 2026 – September 2026 |
$871K |
| DMR General Contractors |
2 |
1 |
September 2026 – October 2026 |
$870K |
| Retail Contractors of Puerto Ri |
1 |
1 |
April 2026 |
$865K |
| Marand Builders |
1 |
1 |
April 2026 |
$864K |
| Jimmy L Joyner |
1 |
1 |
January 2026 |
$862K |
| Amh Development Gc |
4 |
1 |
March 2026 – July 2026 |
$856K |
| Abise Enterprises Limited |
2 |
2 |
January 2026 – July 2026 |
$842K |
| Horizon Retail |
3 |
2 |
February 2026 – July 2026 |
$841K |
| Ascent Construction Group |
8 |
4 |
March 2026 – October 2026 |
$838K |
| Bush Design-Build |
5 |
1 |
October 2026 |
$835K |
| Parsons Roofing |
4 |
3 |
March 2026 – September 2026 |
$830K |
| Venture South Development |
1 |
1 |
February 2026 |
$824K |
| Ge Pools |
7 |
4 |
March 2026 – November 2026 |
$821K |
| Reinforced Wall Systems |
20 |
3 |
January 2026 – November 2026 |
$818K |
| Choate Construction |
1 |
1 |
August 2026 |
$816K |
| Neptune Pools |
9 |
3 |
January 2026 – August 2026 |
$810K |
| Wysocki Brothers |
1 |
1 |
February 2026 |
$800K |
| Nelson A Borgeson |
3 |
2 |
August 2026 – September 2026 |
$792K |
| Johnny L Tuggle Builders |
2 |
2 |
March 2026 – July 2026 |
$791K |
| GA Premier Renovations |
2 |
2 |
June 2026 – October 2026 |
$791K |
| Kc Construction of Georgia |
2 |
1 |
October 2026 |
$780K |
| Rectenwald Brothers |
1 |
1 |
January 2026 |
$780K |
| Parkview Scapes and Construction |
1 |
1 |
April 2026 |
$778K |
| Britman Enterprises |
1 |
1 |
April 2026 |
$766K |
| Service Experts & Air |
55 |
11 |
January 2026 – October 2026 |
$765K |
| Risco Construction |
1 |
1 |
August 2026 |
$750K |
| Alcovy Builders |
1 |
1 |
May 2026 |
$735K |
| Collins & Arnold Const. Co., L |
8 |
1 |
February 2026 – May 2026 |
$712K |
| P.E.B. Construction |
3 |
1 |
September 2026 – November 2026 |
$706K |
| Versatile Industrial |
1 |
1 |
January 2026 |
$703K |
| Farris Interior |
1 |
1 |
May 2026 |
$700K |
| Von Hubbard Contractors |
1 |
1 |
August 2026 |
$699K |
| Lei Feng Construction |
7 |
4 |
January 2026 – July 2026 |
$693K |
| William Giarratano |
10 |
7 |
December 2025 – October 2026 |
$692K |
| Intown Renovations |
4 |
4 |
March 2026 – August 2026 |
$682K |
| Newco Construction of America |
1 |
1 |
May 2026 |
$668K |
| USA Eagle Carports |
1 |
1 |
April 2026 |
$666K |
| Ragsdale Heating and Air |
44 |
8 |
January 2026 – October 2026 |
$662K |
| Unique Homes |
4 |
1 |
May 2026 – August 2026 |
$660K |
| HMC Construction Group |
1 |
1 |
May 2026 |
$650K |
| Eisenhower Services |
1 |
1 |
April 2026 |
$649K |
| Premier Homes |
1 |
1 |
June 2026 |
$645K |
| Milestone Building |
1 |
1 |
May 2026 |
$645K |
| Moeller Purcell |
9 |
4 |
April 2026 – October 2026 |
$645K |
| Mtscapes |
2 |
2 |
January 2026 – May 2026 |
$640K |
| Plansouth |
1 |
1 |
October 2026 |
$636K |
| Carolina Handling |
2 |
2 |
September 2026 – October 2026 |
$629K |
| Pands Construction |
1 |
1 |
February 2026 |
$628K |
| G. Ragsdale Builders |
3 |
2 |
February 2026 – October 2026 |
$625K |
| Assets Construction |
2 |
2 |
July 2026 – October 2026 |
$625K |
| Byrnes Contracting |
4 |
3 |
February 2026 – September 2026 |
$620K |
| Ecs Management |
4 |
3 |
February 2026 – October 2026 |
$613K |
| Premier Build |
1 |
1 |
March 2026 |
$609K |
| 4K Properties |
1 |
1 |
March 2026 |
$603K |
| Raven Construction |
3 |
2 |
January 2026 – August 2026 |
$595K |
| Arieh Builders |
1 |
1 |
March 2026 |
$594K |
| Scott Contracting |
6 |
2 |
March 2026 – November 2026 |
$591K |
| Pinnacle Construction |
1 |
1 |
April 2026 |
$591K |
| Firefly Construction Group |
33 |
1 |
March 2026 – November 2026 |
$582K |
| Groundworks Georgia |
63 |
13 |
January 2026 – November 2026 |
$574K |
| Integrity Construction |
1 |
1 |
June 2026 |
$570K |
| MJ2 Contracting |
3 |
3 |
April 2026 – May 2026 |
$565K |
| Acworth Recycling |
1 |
1 |
March 2026 |
$564K |
| Fall Line Construction |
2 |
1 |
February 2026 – March 2026 |
$560K |
| Pepe & Caarlos |
2 |
2 |
May 2026 – August 2026 |
$559K |
| 4M Construction |
1 |
1 |
March 2026 |
$557K |
| Crystal Hospitality Group |
2 |
1 |
April 2026 – October 2026 |
$550K |
| Management Resource |
1 |
1 |
September 2026 |
$550K |
| Action Retail Construction |
2 |
1 |
February 2026 – April 2026 |
$538K |
| Great Day Improvements |
8 |
4 |
February 2026 – October 2026 |
$532K |
| MHL Solutions |
2 |
2 |
March 2026 – July 2026 |
$532K |
| Rollen Commercial |
5 |
2 |
January 2026 – September 2026 |
$528K |
| Leslie Hunter Contracting |
5 |
4 |
March 2026 – August 2026 |
$526K |
| Dove Contracting |
3 |
2 |
June 2026 – October 2026 |
$526K |
| Pointe Development Group |
1 |
1 |
June 2026 |
$525K |
| Wize Solutions Racking |
1 |
1 |
August 2026 |
$510K |
| Griffin Construction Srvs |
2 |
1 |
August 2026 |
$509K |
| Empwr Solar |
23 |
7 |
April 2026 – June 2026 |
$508K |
| Bryant Built of Georgia |
4 |
3 |
March 2026 – July 2026 |
$504K |
| DMC Home Improvement |
1 |
1 |
February 2026 |
$502K |
| Azar Construction |
1 |
1 |
November 2026 |
$500K |
| Design 220 |
1 |
1 |
January 2026 |
$500K |
| Dakota Contractors |
1 |
1 |
March 2026 |
$493K |
| CBH General Contracting |
1 |
1 |
March 2026 |
$486K |
| Landman Development |
4 |
4 |
December 2025 – November 2026 |
$486K |
| Allgood Home Services |
51 |
11 |
August 2026 – October 2026 |
$480K |
| Whites Pools |
5 |
3 |
March 2026 – September 2026 |
$480K |
| Sparta Stone |
2 |
2 |
March 2026 |
$480K |
| Architectural Fountains |
2 |
1 |
May 2026 – August 2026 |
$479K |
| Longhorn Ventures |
1 |
1 |
May 2026 |
$478K |
| GMC Blue Service |
2 |
2 |
August 2026 – September 2026 |
$476K |
| Exodus 36 Creations |
5 |
4 |
February 2026 – September 2026 |
$473K |
| DWM Inc of New York |
2 |
2 |
September 2026 |
$470K |
| D&L Contracting Services |
9 |
3 |
January 2026 – November 2026 |
$466K |
| Duffey Southeast |
1 |
1 |
April 2026 |
$464K |
| Deluxeton Homes |
1 |
1 |
May 2026 |
$463K |
| CA South |
2 |
1 |
March 2026 |
$463K |
| Paces Restoration |
1 |
1 |
May 2026 |
$459K |
| Contour Retaining Walls |
2 |
2 |
January 2026 – June 2026 |
$456K |
| Trinline Construction |
2 |
1 |
November 2026 |
$454K |
| Georgia Mechanical |
1 |
1 |
June 2026 |
$444K |
| Cameron Palmer Homes |
1 |
1 |
June 2026 |
$442K |
| Polarworx |
1 |
1 |
May 2026 |
$435K |
| Lewis Electrical |
3 |
3 |
January 2026 – June 2026 |
$433K |
| Peachtree Developments |
3 |
2 |
June 2026 – October 2026 |
$427K |
| Abev Power Solutionss |
13 |
8 |
March 2026 – November 2026 |
$426K |
| Srng |
3 |
1 |
May 2026 |
$425K |
| Bynum & Sons Plumbing |
177 |
14 |
December 2025 – November 2026 |
$420K |
| Warehouse Cubed |
2 |
2 |
June 2026 – October 2026 |
$413K |
| Southland Homes |
1 |
1 |
January 2026 |
$407K |
| Murray Electric |
7 |
4 |
January 2026 – October 2026 |
$406K |
| Miller Construction |
1 |
1 |
January 2026 |
$404K |
| Barranco Enterprises |
4 |
3 |
March 2026 – August 2026 |
$403K |
| Refuge Roofing & Restoration |
3 |
3 |
January 2026 – August 2026 |
$400K |
| Contek Construction |
1 |
1 |
April 2026 |
$400K |
| Southpaw Solutions |
1 |
1 |
November 2026 |
$400K |
| Simon P. Reynolds |
1 |
1 |
January 2026 |
$400K |
| Halifax Construction |
2 |
1 |
March 2026 – August 2026 |
$399K |
| Bill Golden Construction |
1 |
1 |
May 2026 |
$399K |
| Cedar Creek Construction |
2 |
1 |
February 2026 – March 2026 |
$390K |
| CMB Construction |
1 |
1 |
April 2026 |
$390K |
| Veritas Homes |
1 |
1 |
October 2026 |
$389K |
| Premier Pools & Spas |
5 |
3 |
April 2026 – October 2026 |
$387K |
| Tesla Energy Operations |
13 |
8 |
February 2026 – October 2026 |
$387K |
| Apollo Primm Southeast |
1 |
1 |
September 2026 |
$382K |
| Luxury Construction |
7 |
4 |
January 2026 – October 2026 |
$377K |
| Gilbane Building |
3 |
1 |
July 2026 |
$375K |
| Essential Construction |
1 |
1 |
July 2026 |
$375K |
| Southern Ec Electrical |
4 |
3 |
January 2026 – September 2026 |
$374K |
| De Jager Construction |
1 |
1 |
February 2026 |
$367K |
| Cornerstone Contracting |
3 |
2 |
July 2026 – October 2026 |
$354K |
| G & S Mendoza Grading |
4 |
1 |
July 2026 – September 2026 |
$353K |
| Russell Hatcher Electric |
5 |
4 |
February 2026 – November 2026 |
$353K |
| Miller & |
2 |
1 |
April 2026 – September 2026 |
$350K |
| J Baker Construction |
1 |
1 |
August 2026 |
$350K |
| Ogc |
1 |
1 |
May 2026 |
$350K |
| Pioneer General |
1 |
1 |
February 2026 |
$350K |
| JMR Home Services |
5 |
4 |
March 2026 – August 2026 |
$342K |
| Affinity Pools |
3 |
3 |
April 2026 – May 2026 |
$342K |
| BHD Storage Solutions |
3 |
2 |
January 2026 – October 2026 |
$340K |
| Southeast Restoration |
2 |
2 |
February 2026 – March 2026 |
$340K |
| Ram General Contractors |
4 |
2 |
April 2026 – May 2026 |
$339K |
| Top South D & P |
7 |
4 |
January 2026 – October 2026 |
$337K |
| Green Pacific |
5 |
4 |
April 2026 – July 2026 |
$336K |
| American Lifestyle Pools |
4 |
2 |
February 2026 – May 2026 |
$335K |
| Green Heart Enterprises |
1 |
1 |
June 2026 |
$332K |
| Specialty Construction |
1 |
1 |
February 2026 |
$332K |
| GHS Construction |
16 |
3 |
February 2026 – October 2026 |
$330K |
| Pinnacle Services Group |
1 |
1 |
September 2026 |
$326K |
| Turner Construction |
1 |
1 |
September 2026 |
$325K |
| Civil Site Services |
8 |
1 |
April 2026 |
$320K |
| Tristar America |
2 |
1 |
October 2026 |
$315K |
| Antoine Fregeolle |
1 |
1 |
June 2026 |
$315K |
| Kin Kwok's Success |
2 |
2 |
July 2026 – September 2026 |
$312K |
| Redemption General |
7 |
3 |
April 2026 – September 2026 |
$312K |
| Parker Young Construction |
2 |
1 |
July 2026 – September 2026 |
$311K |
| United Contracting & Roofing |
3 |
2 |
August 2026 – September 2026 |
$310K |
| Cajun Construction |
1 |
1 |
August 2026 |
$310K |
| Builders Professional |
2 |
2 |
January 2026 – February 2026 |
$305K |
| Aqualis Pools |
6 |
2 |
March 2026 – September 2026 |
$302K |
| Bc Unlimited |
2 |
2 |
December 2025 – July 2026 |
$300K |
| Brent Road Builders |
2 |
1 |
August 2026 |
$300K |
| Hoar Construction |
1 |
1 |
June 2026 |
$300K |
| Knight Electric |
1 |
1 |
August 2026 |
$300K |
| Miter Contracting |
1 |
1 |
October 2026 |
$300K |
| MLW Builders |
1 |
1 |
June 2026 |
$300K |
| Arris |
1 |
1 |
April 2026 |
$296K |
| Valet Works Construction |
1 |
1 |
September 2026 |
$296K |
| Associationready |
1 |
1 |
July 2026 |
$292K |
| Service First Roofing |
1 |
1 |
July 2026 |
$290K |
| Rico Electric |
3 |
2 |
April 2026 – November 2026 |
$288K |
| Powerhouse Retail |
3 |
3 |
March 2026 – August 2026 |
$285K |
| Mac Construction |
2 |
1 |
July 2026 |
$284K |
| Encore Roofing |
2 |
2 |
August 2026 – September 2026 |
$283K |
| Gsat Restoration |
1 |
1 |
September 2026 |
$280K |
| Caliber 1 Construction |
1 |
1 |
August 2026 |
$279K |
| Retaining Walls |
8 |
2 |
June 2026 – August 2026 |
$271K |
| Vibe Construction Group |
2 |
2 |
May 2026 |
$270K |
| Outback Deck |
7 |
6 |
March 2026 – October 2026 |
$266K |
| Campione Construction |
1 |
1 |
March 2026 |
$263K |
| Baldpates General |
25 |
1 |
September 2026 |
$257K |
| Red Door Renovations and Design |
1 |
1 |
August 2026 |
$252K |
| Harry's Home Renovations |
3 |
3 |
February 2026 – July 2026 |
$251K |
| Ferguson Construction |
3 |
3 |
June 2026 – August 2026 |
$250K |
| Ironstone Construction |
1 |
1 |
February 2026 |
$250K |
| Smith & |
1 |
1 |
February 2026 |
$250K |
| Stonecraft Design & Build |
1 |
1 |
March 2026 |
$250K |
| Occupied Renovations |
3 |
1 |
February 2026 – October 2026 |
$231K |
| Nextedge Networks |
3 |
1 |
February 2026 – May 2026 |
$230K |
| Shukran Construction |
6 |
2 |
May 2026 – August 2026 |
$229K |
| Four Winds Construction |
2 |
1 |
May 2026 – August 2026 |
$225K |
| Fusion Construction Group |
11 |
2 |
August 2026 – September 2026 |
$224K |
| Wath |
3 |
2 |
February 2026 – May 2026 |
$224K |
| Bakop Construction |
3 |
3 |
January 2026 – April 2026 |
$221K |
| Green Light Electric |
4 |
3 |
March 2026 – October 2026 |
$220K |
| A New Day Construction |
6 |
4 |
December 2025 – November 2026 |
$214K |
| Good Morning Remodel |
2 |
2 |
March 2026 – August 2026 |
$210K |
| Two Jimmys Construction |
5 |
4 |
January 2026 – July 2026 |
$205K |
| Stanley Electrical |
3 |
2 |
June 2026 – October 2026 |
$205K |
| C & G Site Services |
4 |
1 |
October 2026 |
$201K |
| Tuff Shed |
12 |
6 |
January 2026 – November 2026 |
$201K |
| E. Dennis Heating, Cooling, Plumbing & Electrical |
13 |
6 |
March 2026 – September 2026 |
$196K |
| Dgkp Services |
3 |
3 |
April 2026 – September 2026 |
$175K |
| Outback Forestry |
5 |
2 |
February 2026 – July 2026 |
$165K |
| Georgia Flooring |
3 |
1 |
March 2026 – November 2026 |
$162K |
| Great Heron Homes |
2 |
1 |
April 2026 |
$160K |
| Spartanx |
6 |
3 |
March 2026 – July 2026 |
$160K |
| Jay Ire Properties |
2 |
1 |
March 2026 |
$159K |
| McNair Construction |
5 |
1 |
April 2026 – November 2026 |
$157K |
| Southern Demolition |
2 |
1 |
February 2026 |
$153K |
| THS National |
16 |
1 |
October 2026 |
$150K |
| Build Your Own Pool of Georgia |
2 |
2 |
June 2026 – August 2026 |
$150K |
| Coliman Interior Services |
2 |
2 |
July 2026 – November 2026 |
$150K |
| T & P Resources |
3 |
2 |
January 2026 – April 2026 |
$149K |
| Moncrief Heating & Air |
12 |
5 |
March 2026 – October 2026 |
$146K |
| Parclife Homes |
2 |
2 |
April 2026 – May 2026 |
$145K |
| Neese Heating & Air |
19 |
5 |
January 2026 – November 2026 |
$144K |
| Tayva Holdings |
3 |
2 |
February 2026 – March 2026 |
$143K |
| Nelson Exteriors |
4 |
4 |
February 2026 – October 2026 |
$142K |
| Southern Environmental |
9 |
3 |
May 2026 – September 2026 |
$142K |
| Progressive Home |
2 |
1 |
April 2026 – October 2026 |
$140K |
| Skewed Designs |
4 |
3 |
April 2026 – September 2026 |
$140K |
| West Georgia Electric |
9 |
1 |
January 2026 – October 2026 |
$137K |
| Ayers Services |
2 |
2 |
March 2026 – July 2026 |
$135K |
| Metro Pools and Patios |
2 |
2 |
April 2026 – May 2026 |
$130K |
| Rise Custom and Design |
2 |
1 |
July 2026 – October 2026 |
$130K |
| Oldham Contracting |
2 |
2 |
October 2026 |
$129K |
| Classey Comfort Heating & Air |
57 |
5 |
January 2026 – November 2026 |
$128K |
| Green Basements & Remodeling |
2 |
2 |
March 2026 – June 2026 |
$123K |
| Tenwayz Electric |
4 |
2 |
July 2026 – November 2026 |
$122K |
| Empire Roofing & Restoration |
4 |
3 |
April 2026 – July 2026 |
$121K |
| Adroit A.G |
3 |
3 |
February 2026 – October 2026 |
$120K |
| Blusky Restoration |
2 |
2 |
April 2026 – July 2026 |
$120K |
| Ben Hill Renovations |
4 |
4 |
May 2026 – October 2026 |
$120K |
| Beyond Measure Home |
4 |
2 |
April 2026 – May 2026 |
$117K |
| Freedom Forever GA |
3 |
3 |
February 2026 – March 2026 |
$115K |
| Weldon Plumbing Heating & Air |
11 |
5 |
March 2026 – August 2026 |
$113K |
| Able Contracting |
2 |
2 |
October 2026 |
$113K |
| Blevins and Son General |
2 |
1 |
August 2026 |
$111K |
| Perimeter Roofing |
4 |
3 |
May 2026 – September 2026 |
$110K |
| Champion Construction |
2 |
1 |
April 2026 – September 2026 |
$109K |
| Bardi |
13 |
9 |
January 2026 – September 2026 |
$109K |
| Capital City Electrical |
6 |
4 |
February 2026 – August 2026 |
$109K |
| Atlanta Porch and Patio |
2 |
2 |
May 2026 – September 2026 |
$108K |
| Modern Day Commodities |
2 |
1 |
February 2026 – June 2026 |
$108K |
| Jake Brown Construction |
2 |
2 |
March 2026 – July 2026 |
$105K |
| Ares Holdings |
3 |
2 |
March 2026 – September 2026 |
$105K |
| Billy Gray Contracting |
24 |
1 |
May 2026 |
$103K |
| United Air Temp Air Cond & Hea |
8 |
5 |
March 2026 – October 2026 |
$102K |
| Chili Pepper Enterprises |
2 |
2 |
April 2026 |
$102K |
| Gde Renovations |
5 |
1 |
August 2026 |
$100K |
| All in One Pool |
2 |
2 |
September 2026 – October 2026 |
$100K |
| Music Plumbing |
14 |
7 |
January 2026 – September 2026 |
$99K |
| JBQ & Associate |
2 |
2 |
March 2026 – July 2026 |
$98K |
| Rockdeck |
4 |
3 |
March 2026 – July 2026 |
$97K |
| H2O Electric |
2 |
2 |
March 2026 – July 2026 |
$97K |
| Power Support Partners |
10 |
7 |
January 2026 – November 2026 |
$90K |
| Primetime Pools |
2 |
2 |
September 2026 – October 2026 |
$90K |
| Supreme Pool Construction |
2 |
1 |
February 2026 – March 2026 |
$89K |
| B. J. Gunter |
3 |
2 |
June 2026 – July 2026 |
$88K |
| Mister Sparky |
9 |
6 |
January 2026 – October 2026 |
$87K |
| Perry Electrical |
6 |
4 |
January 2026 – August 2026 |
$87K |
| Gray Construction |
2 |
1 |
April 2026 – June 2026 |
$86K |
| Jackson Grey Enterprises |
3 |
2 |
January 2026 |
$85K |
| Dolly Properties |
2 |
1 |
June 2026 – August 2026 |
$85K |
| Gori Electrical Service |
19 |
2 |
February 2026 – August 2026 |
$85K |
| Storm Construction |
2 |
1 |
June 2026 – July 2026 |
$80K |
| Tuxedo Mech & Plumbing |
2 |
1 |
October 2026 |
$79K |
| Triad Mech Srvc Specialist |
15 |
5 |
January 2026 – October 2026 |
$79K |
| Prestige Sales |
2 |
1 |
March 2026 – November 2026 |
$79K |
| Stampede Construction |
3 |
3 |
March 2026 – August 2026 |
$78K |
| Shane Karrigan Electrical |
2 |
1 |
July 2026 – August 2026 |
$78K |
| X Power |
2 |
2 |
February 2026 – July 2026 |
$77K |
| Sba Network Services |
3 |
2 |
June 2026 – November 2026 |
$76K |
| Cuttingedge Built |
2 |
2 |
January 2026 – August 2026 |
$75K |
| Mark Turner Grading |
2 |
1 |
August 2026 – October 2026 |
$74K |
| America's Best Choice |
2 |
1 |
June 2026 – September 2026 |
$74K |
| Redwood Construction |
2 |
1 |
March 2026 – June 2026 |
$73K |
| Solar Energy Partners |
8 |
6 |
January 2026 – July 2026 |
$72K |
| J and D Custom Builders |
2 |
2 |
January 2026 – March 2026 |
$72K |
| Trimen Enterprises |
2 |
1 |
April 2026 |
$72K |
| Anderson Power Services |
9 |
4 |
May 2026 – October 2026 |
$72K |
| Ansco & Associates |
5 |
3 |
December 2025 – November 2026 |
$71K |
| STF Contracting |
3 |
2 |
August 2026 – November 2026 |
$71K |
| Midtown ATL GA |
3 |
3 |
February 2026 – August 2026 |
$71K |
| Roc Holdings Int. |
2 |
2 |
April 2026 – May 2026 |
$70K |
| Luminate Energy GA |
3 |
2 |
May 2026 – June 2026 |
$68K |
| PSG Energy Services |
2 |
1 |
July 2026 – September 2026 |
$65K |
| Cleveland Electric |
13 |
2 |
February 2026 – March 2026 |
$65K |
| Unica Construction Group |
4 |
2 |
July 2026 – August 2026 |
$64K |
| Kings Floor Covering |
3 |
2 |
January 2026 – February 2026 |
$62K |
| Generator Supercenter |
4 |
2 |
March 2026 – July 2026 |
$61K |
| Dreamlight |
2 |
1 |
July 2026 – August 2026 |
$60K |
| Partitions |
2 |
1 |
February 2026 – March 2026 |
$60K |
| Miller Contracting |
2 |
2 |
February 2026 – July 2026 |
$59K |
| Ams |
6 |
6 |
March 2026 – October 2026 |
$59K |
| J&I Cordon Electric |
9 |
5 |
February 2026 – October 2026 |
$55K |
| A&D Horizon |
4 |
3 |
March 2026 – June 2026 |
$55K |
| Jessie Ethridge Pools |
2 |
2 |
May 2026 – July 2026 |
$53K |
| Redfern Electrical |
5 |
3 |
January 2026 – April 2026 |
$51K |
| Holtkamp Heating & Air |
7 |
2 |
December 2025 – June 2026 |
$50K |
| Blue Skies Atlanta |
4 |
4 |
February 2026 – June 2026 |
$50K |
| Joseph Stockdale |
2 |
1 |
March 2026 |
$50K |
| Lin R Rogers Electrical |
2 |
2 |
January 2026 – October 2026 |
$50K |
| Adaco Construction |
3 |
3 |
March 2026 – April 2026 |
$49K |
| Alexis C Huntley |
2 |
2 |
March 2026 – April 2026 |
$49K |
| Superior Plumbing Services |
29 |
9 |
January 2026 – November 2026 |
$47K |
| Cablik Enterprises |
2 |
1 |
January 2026 |
$46K |
| Thomas Construction |
3 |
3 |
February 2026 – March 2026 |
$46K |
| Teleworld Solutions |
3 |
3 |
April 2026 – September 2026 |
$45K |
| Mr Fix It 30121 |
2 |
2 |
March 2026 – August 2026 |
$45K |
| Weldon Electric II |
4 |
3 |
February 2026 – August 2026 |
$43K |
| Dacula Pool Service |
2 |
1 |
June 2026 – July 2026 |
$43K |
| Rs Andrews Services |
4 |
4 |
December 2025 – October 2026 |
$42K |
| Hygrade Electrical |
5 |
4 |
January 2026 – October 2026 |
$42K |
| Dynamic Warehouse |
2 |
2 |
July 2026 – September 2026 |
$42K |
| Lennox Aes Holdings |
2 |
2 |
July 2026 – August 2026 |
$42K |
| SLB Construction Services |
2 |
2 |
July 2026 – October 2026 |
$41K |
| CMS, Wireless |
2 |
2 |
September 2026 – October 2026 |
$40K |
| Skyline Outdoor |
2 |
2 |
March 2026 – October 2026 |
$40K |
| Clayton Signs |
2 |
2 |
May 2026 – August 2026 |
$40K |
| Stellar Home Maintenance |
24 |
5 |
March 2026 – November 2026 |
$40K |
| Proterra Development |
3 |
1 |
February 2026 – November 2026 |
$39K |
| LCN Electric Svcs |
16 |
4 |
January 2026 – November 2026 |
$39K |
| Decks Unlimited |
2 |
2 |
September 2026 – October 2026 |
$37K |
| McKenneys |
2 |
2 |
February 2026 – July 2026 |
$37K |
| Make It Happen Plumbing |
2 |
2 |
October 2026 |
$36K |
| Myers Industrial |
2 |
2 |
May 2026 – September 2026 |
$36K |
| RCB Renovations |
2 |
2 |
May 2026 |
$35K |
| Perkins Generator & Sales |
2 |
2 |
February 2026 |
$35K |
| Rack Men Equipment |
2 |
2 |
March 2026 – May 2026 |
$35K |
| Fortress Walls & Hardscapes |
2 |
2 |
February 2026 – March 2026 |
$35K |
| Exovations of Atlanta |
2 |
2 |
February 2026 – August 2026 |
$33K |
| Broughton Heating, Air |
4 |
4 |
January 2026 – August 2026 |
$32K |
| Chen Plumbing Enterprises |
3 |
2 |
February 2026 – June 2026 |
$32K |
| Range Water Construction |
2 |
1 |
November 2026 |
$31K |
| Green Circle Demolition |
3 |
2 |
January 2026 – February 2026 |
$30K |
| Ecomind Group |
2 |
2 |
March 2026 – September 2026 |
$30K |
| Breezeway Heating and Air |
7 |
2 |
January 2026 – October 2026 |
$30K |
| Robinson Electric |
6 |
3 |
April 2026 – October 2026 |
$29K |
| Rs Andrews |
2 |
2 |
February 2026 – July 2026 |
$29K |
| SLZ Services |
3 |
3 |
January 2026 – October 2026 |
$28K |
| Pc Electrical Services |
2 |
2 |
February 2026 – May 2026 |
$28K |
| Plumbing Express |
3 |
2 |
January 2026 – September 2026 |
$27K |
| Pv Heating & Air |
3 |
2 |
March 2026 – November 2026 |
$27K |
| Epa Distributors |
2 |
2 |
May 2026 – July 2026 |
$27K |
| Linda Diulus |
2 |
2 |
April 2026 – July 2026 |
$27K |
| Demolition Dawgs |
2 |
2 |
August 2026 – October 2026 |
$26K |
| Expert Connections |
2 |
2 |
August 2026 |
$26K |
| Arc Angel Electric |
3 |
3 |
July 2026 – September 2026 |
$26K |
| Dream Build Development |
3 |
1 |
March 2026 |
$25K |
| Schoppman |
3 |
1 |
June 2026 |
$25K |
| Dependable Electric |
8 |
3 |
March 2026 – November 2026 |
$25K |
| Elco Tech Electric Heating |
6 |
4 |
January 2026 – September 2026 |
$24K |
| Armstrong Specialties |
7 |
5 |
February 2026 – October 2026 |
$23K |
| Aardvark Electric |
3 |
3 |
March 2026 – August 2026 |
$23K |
| U-Tec Construction |
2 |
2 |
June 2026 – July 2026 |
$23K |
| Gritty Electrical |
4 |
2 |
June 2026 – July 2026 |
$22K |
| Huff Electric |
2 |
1 |
April 2026 – June 2026 |
$22K |
| Cool Masters |
2 |
2 |
July 2026 – August 2026 |
$22K |
| 5 Star Electric |
10 |
7 |
February 2026 – August 2026 |
$22K |
| CW Electrical Services |
22 |
4 |
April 2026 – October 2026 |
$21K |
| Climate Masters HVAC |
2 |
2 |
May 2026 – June 2026 |
$20K |
| TJS Electrical Contractors |
2 |
2 |
August 2026 – November 2026 |
$20K |
| Founders Georgia |
3 |
3 |
June 2026 – August 2026 |
$19K |
| Lennox National Account |
2 |
2 |
July 2026 – August 2026 |
$19K |
| Good Shepherd Roofing |
2 |
2 |
May 2026 – August 2026 |
$19K |
| Positive Flow Electrical |
2 |
1 |
May 2026 |
$19K |
| Socket Doctors |
10 |
5 |
January 2026 – October 2026 |
$19K |
| Energy Construction |
3 |
2 |
April 2026 – June 2026 |
$19K |
| Boswell Electric |
3 |
3 |
August 2026 |
$19K |
| Varela Electric |
2 |
2 |
January 2026 – April 2026 |
$19K |
| Seasons Comforts |
2 |
2 |
June 2026 – September 2026 |
$18K |
| DJR Contractors |
2 |
1 |
May 2026 – August 2026 |
$18K |
| Robert Madden |
3 |
3 |
April 2026 – October 2026 |
$17K |
| Smart Electrical Solutions |
2 |
2 |
January 2026 – March 2026 |
$16K |
| Cir Electric |
5 |
4 |
February 2026 – October 2026 |
$16K |
| Concurrent Telecom |
2 |
1 |
August 2026 |
$15K |
| Eic |
2 |
1 |
April 2026 |
$15K |
| Stanley R. Mitchell |
2 |
1 |
January 2026 – September 2026 |
$15K |
| Deep Dive Plumbing & Drain |
5 |
3 |
January 2026 – September 2026 |
$15K |
| Top Tier Electrical |
5 |
3 |
February 2026 – November 2026 |
$15K |
| Merck & Associates |
3 |
2 |
August 2026 – September 2026 |
$14K |
| Complete Comfort |
15 |
6 |
February 2026 – October 2026 |
$14K |
| Md Electrical Contracting |
4 |
4 |
April 2026 – November 2026 |
$14K |
| Benco Construction |
2 |
1 |
February 2026 – March 2026 |
$14K |
| Advance Indoor Comfort |
4 |
3 |
February 2026 – March 2026 |
$14K |
| Kelly Thompson |
2 |
1 |
June 2026 – September 2026 |
$13K |
| Stuart Mechanical Services |
3 |
3 |
February 2026 – August 2026 |
$12K |
| Qwiksite |
2 |
2 |
January 2026 – June 2026 |
$12K |
| Strada Services |
2 |
2 |
June 2026 – September 2026 |
$11K |
| Mr. Electric of Lawrenceville |
5 |
2 |
August 2026 – October 2026 |
$11K |
| DMS Contractors |
2 |
2 |
February 2026 |
$10K |
| Vinson McDonald |
10 |
5 |
December 2025 – June 2026 |
$10K |
| Air Services |
2 |
2 |
February 2026 – June 2026 |
$10K |
| Alpha Volt Electric |
2 |
2 |
July 2026 – August 2026 |
$10K |
| Astro Cs |
2 |
1 |
May 2026 – June 2026 |
$10K |
| One Time Electric |
2 |
1 |
March 2026 |
$10K |
| Chris Feather Heating & Air |
3 |
3 |
January 2026 – October 2026 |
$10K |
| Omega Heating and Air |
4 |
3 |
February 2026 – October 2026 |
$9K |
| Tesseract Utilities |
6 |
5 |
January 2026 – March 2026 |
$9K |
| Jackson Electrical |
3 |
1 |
May 2026 |
$9K |
| Safe Way Mechanical |
2 |
2 |
September 2026 – October 2026 |
$9K |
| Spectrum Maintenance |
2 |
2 |
April 2026 – August 2026 |
$8K |
| A 1 Work |
3 |
3 |
January 2026 – June 2026 |
$8K |
| Superior Contracting & Maintenance |
2 |
2 |
June 2026 – July 2026 |
$8K |
| Priority Electric |
3 |
3 |
March 2026 – June 2026 |
$8K |
| Investstar |
2 |
1 |
October 2026 |
$8K |
| Jerrys Electric |
5 |
3 |
December 2025 – August 2026 |
$8K |
| Greenlee Plumbing |
2 |
2 |
August 2026 – October 2026 |
$8K |
| Bethelectric |
3 |
3 |
August 2026 – October 2026 |
$8K |
| Integrity Electric |
3 |
2 |
April 2026 |
$8K |
| Neal Price Electric |
3 |
2 |
January 2026 – June 2026 |
$8K |
| Nuenergy Atlanta |
3 |
3 |
January 2026 – November 2026 |
$7K |
| Auro Electric |
5 |
4 |
March 2026 – September 2026 |
$7K |
| Kg Electrical Solutions |
2 |
2 |
March 2026 – July 2026 |
$7K |
| Kma Electrical Services |
3 |
1 |
May 2026 – July 2026 |
$7K |
| Synergy Electrical |
4 |
3 |
March 2026 – September 2026 |
$7K |
| Metro Atlanta Electric |
4 |
3 |
March 2026 – October 2026 |
$7K |
| Manross Gas Works |
4 |
3 |
March 2026 – August 2026 |
$7K |
| Electrical Alliance Tech |
3 |
2 |
January 2026 – November 2026 |
$7K |
| U.S.A Electric |
7 |
4 |
February 2026 – September 2026 |
$7K |
| Acr Bright Electric |
3 |
2 |
April 2026 – June 2026 |
$7K |
| Hiram Home Services |
4 |
3 |
January 2026 – August 2026 |
$6K |
| DSL Electric |
2 |
2 |
January 2026 |
$6K |
| Luke & John Electric |
2 |
2 |
February 2026 – July 2026 |
$6K |
| Mission To the World Pca |
2 |
1 |
June 2026 |
$6K |
| Vastex |
2 |
2 |
March 2026 – June 2026 |
$6K |
| Trublu Services |
3 |
2 |
January 2026 – November 2026 |
$5K |
| Pratt Brothers |
3 |
3 |
September 2026 |
$5K |
| Picovolt |
2 |
1 |
September 2026 |
$5K |
| Car Charger Specialists |
4 |
3 |
June 2026 – August 2026 |
$5K |
| Kerolabs |
4 |
1 |
March 2026 – October 2026 |
$5K |
| Dalton Electric |
3 |
3 |
January 2026 – August 2026 |
$5K |
| Jj Electric |
3 |
3 |
June 2026 – November 2026 |
$5K |
| Sampson Electric |
4 |
3 |
April 2026 – September 2026 |
$4K |
| Georgia Pallet Rack |
3 |
3 |
January 2026 – March 2026 |
$4K |
| Knock Out Electric |
3 |
2 |
April 2026 |
$4K |
| Sundial Plumbing |
2 |
1 |
February 2026 – March 2026 |
$4K |
| Big Frog Electric |
2 |
1 |
March 2026 – May 2026 |
$4K |
| Maddox Electrical Services |
2 |
2 |
June 2026 – October 2026 |
$4K |
| Delta Power Electric |
4 |
3 |
July 2026 – August 2026 |
$4K |
| DC Electric |
7 |
4 |
December 2025 – November 2026 |
$4K |
| Gb Electric Services |
3 |
2 |
March 2026 – September 2026 |
$4K |
| Willco Electric |
3 |
2 |
June 2026 – September 2026 |
$4K |
| Ies Residential |
2 |
1 |
June 2026 – July 2026 |
$4K |
| Blackstock Electric |
2 |
2 |
February 2026 |
$3K |
| Boss Energy |
3 |
3 |
August 2026 – November 2026 |
$3K |
| Clear Channel Outdoor |
2 |
2 |
February 2026 – October 2026 |
$3K |
| Adams Electrical |
2 |
1 |
April 2026 – June 2026 |
$3K |
| Cesar Electric |
2 |
2 |
April 2026 – June 2026 |
$3K |
| Face N Sons |
2 |
1 |
March 2026 – September 2026 |
$3K |
| Phillips Mobile Home |
2 |
2 |
April 2026 – July 2026 |
$3K |
| Kalahari Electrical |
3 |
2 |
January 2026 – July 2026 |
$3K |
| Georgia Green Energy |
3 |
3 |
April 2026 – August 2026 |
$3K |
| Pronto Plumbing |
2 |
1 |
September 2026 – October 2026 |
$3K |
| Stellar Electric |
4 |
4 |
March 2026 – November 2026 |
$3K |
| Southern Lights Electric |
5 |
2 |
January 2026 – June 2026 |
$3K |
| Jenni Bg Plumbing |
5 |
2 |
July 2026 – November 2026 |
$2K |
| Atlanta Master |
3 |
2 |
July 2026 – August 2026 |
$2K |
| Plantation Electrical |
4 |
2 |
January 2026 – July 2026 |
$2K |
| Copper Electric |
2 |
2 |
April 2026 – August 2026 |
$2K |
| Alliance Electric |
2 |
2 |
May 2026 – September 2026 |
$2K |
| Generation Electric |
2 |
2 |
February 2026 – June 2026 |
$2K |
| Jenkins Contracting |
2 |
1 |
July 2026 |
$2K |
| Legacy Electric Solutions |
2 |
1 |
July 2026 – October 2026 |
$1K |
| Arias Electrical Service |
2 |
2 |
April 2026 – May 2026 |
$1K |
| Save A Lot Electric |
2 |
1 |
February 2026 – June 2026 |
$1K |
| Pros Georgia Electric |
2 |
2 |
December 2025 – January 2026 |
$900 |
| Jeff Henderson Builder |
2 |
1 |
October 2026 |
$100 |
| Infinity Performance |
2 |
1 |
March 2026 – June 2026 |
$2 |
| Ml Electrical & Garage |
2 |
2 |
March 2026 – October 2026 |
$2 |
| Pinnacle Air |
2 |
2 |
March 2026 – July 2026 |
$2 |
| Corporation Service |
3 |
3 |
May 2026 |
— |
| MCS Code Compliance |
3 |
2 |
January 2026 |
— |
| Sed Group |
3 |
2 |
May 2026 – June 2026 |
— |
| Premier Property Preservation |
2 |
1 |
May 2026 |
— |